The cosmetics OEM process in 6 steps (40-second video)

A cosmetics OEM/ODM project moves through six steps: planning, formulation, sampling, manufacturing, packaging and delivery. At HBMIC, a lead researcher is assigned within 3 business days of your brief, and the first sample ships in about 5 days. The 40-second video below walks through the whole process.
Step 1 — Planning: start with a concept and a budget
A concept and a budget are enough to begin. Once your brief is received, a lead researcher is assigned within 3 business days. You don't need a benchmark product, but having one shortens development time and improves satisfaction with the final product.
Step 2 — Formulation: a formula designed to match
Our lab designs the texture, function, ingredients and scent around your concept. If the product is for export, tell us the target market at this stage. Regulations differ by country, and developing to the destination's requirements from the start is the fastest route.
Step 3 — Sampling: test it and confirm
The first sample ships in about 5 days. Samples are free, with 100ml provided per product by default. Test it, then either iterate to a second sample or move straight to confirmation.
Once the content is confirmed, the work continues with stability and preservation testing, functional filings with MFDS where needed, packaging component development, compatibility testing, and artwork. This confirmation stage takes about 12 weeks on average.
Step 4 — Manufacturing: made to the confirmed spec
The final quotation is calculated from the confirmed sample, volume, order quantity and packaging specs, and a supply contract is signed. After the order sheet is received, raw and packaging materials are procured. A first batch is produced and the initial bulk standard confirmed before full production begins.
Step 5 — Packaging: only tested content is filled
Content is filled only after microbial testing confirms it is safe. Filling and packaging are followed by a final inspection. You can supply your own packaging components, or have us handle the design from your concept, with up to three free revision rounds.

Step 6 — Delivery: shipment is where distribution starts
The packaged product ships. Delivery isn't the end — it's the start of distribution.
Common scale-up problems, and how our process prevents them
The most common worry in cosmetics OEM is that the finished product won't match the sample you approved. Below are problems the industry runs into often, and the step in HBMIC's process that guards against each one.
“The sample was great, but production came out different.”We do not start full production before the initial bulk standard is confirmed. After the order sheet is received, a first batch is produced, the standard is confirmed, and the order quantity is manufactured to that standard.
“It looked fine at first, then separated in storage.”We do not confirm a formula that hasn't been through stability and preservation testing. Basic observation takes 2–4 weeks and formal stability testing 4–8 weeks, and that time is built into the schedule from the start.
“I asked for a soft feel and the texture is off.”Texture, scent and the full ingredient list are confirmed as a standard before the project moves on. If the first sample misses, we iterate to a second, and if you have a benchmark product we develop against its texture, absorption, viscosity, scent and finish.
“Same formula, but this batch feels different.”Incoming raw materials go through quality inspection before they are used, and both the bulk and the finished product are inspected as well.
“The content is fine, but the pump won't dispense it properly.”We do not confirm packaging components that haven't been tried with the content. Compatibility testing between the content and its container is part of packaging development.
“I'm not sure which sample is the reference.”We do not sign on an ambiguous reference. The quotation and supply contract are fixed to the final sample number, volume, order quantity and packaging specs.
And finally: nothing is filled until microbial testing confirms the content is safe.
Minimum order quantity (MOQ) and timelines
MOQ is based on our minimum batch size of 130kg. The minimum unit count varies by product volume — for a 100ml product, the MOQ is 1,200 units.
Timelines depend on the product. Once we receive your development brief, 30 days is enough to reach final product confirmation; the full confirmation stage, including stability testing, packaging components and artwork, takes about 12 weeks on average.
Getting started
Send us your brief and a lead researcher will contact you within 3 business days.
HBMIC Research is written by the lab team at HBMIC, a cosmetics OEM/ODM manufacturer in Daegu, Korea, founded in 1985 under the former Korean name 한방미인화장품.